7,800 BTO flats will be offered in August 2020

Some of the 3,700 BTO flats that were originally scheduled for May in Choa Chu Kang, Tengah, Pasir Ris and Tampines will be combined with August’s launch. The deferment was a result of the closure of non-essential workplaces such as construction sites.
As a result, HDB will offer about 7,800 flats in Ang Mo Kio, Bishan, Choa Chu Kang, Geylang, Pasir Ris, Tampines, Tengah and Woodlands in August. November’s launch will see another 5,700 flats in the areas of Bishan, Sembawang, Tampines, Tengah and Toa Payoh being offered. In addition, the Choa Chu Kang and Tampines North and Tengah launches will have shorter waiting times.
Lee Sze Teck, director of research at Huttons, says that the Geylang, Pasir Ris and Woodlands BTO are ideal as they are very near to an MRT Station. “We could see up to 10 applicants for each flat offered in the mature estates and up to four applicants for each flat in the non-mature estates,” he adds.
August 2020 BTO Launch: Choa Chu Kang, Tengah, Woodlands, Ang Mo Kio, Bishan, Geylang, Pasir Ris and Tampines
Area
Address
Town/Estate
Flat Mix
Choa Chu Kang
Bounded by Keat Hong Link and Choa Chu Kang Grove
Non-mature
570 units of 2R Flexi, 3R and 4R
Tengah
Along Bukit Batok Road
Non-mature
1,040 units of 2R Flexi, 3R, 4R and 5R
Woodlands
Bounded by Woodlands Avenue 5 and Woodlands Avenue 2
Non-mature
1,770 units of 2R Flexi, 3R, 4R and 5R
Ang Mo Kio
Ang Mo Kio Street 21
Mature
380 units of 4R and 5R
Bishan
Braddell Rd
Mature
470 units of 2R Flexi, 3R and 4R
Geylang
Cassia Link (Dakota)
Mature
420 units of 3R and 4R
Pasir Ris
Pasir Ris Drive 3
Mature
1,070 units of 2R Flexi, 3R, 4R and 5R
Tampines
Bounded by Tampines Street 64 and Tampines Link
Mature
340 units of 3R, 4R and 5R
Tampines
Bounded by Tampines North Drive 1 and Tampines Street 64
Mature
340 units of 4R and 5R
Source: HDB, EdgeProp
A pilot assisted-living project in Bukit Batok, comprising 160 units, which was scheduled to launch in May, is deferred until further notice. HDB will assess when it is safe to reach out to seniors to share the new flat offerings with them.
As the “circuit breaker” officially lifts on June 2, HDB has announced that critical services will be resumed by appointment only. These include booking of flats; key collection for new flats and rental flats; signing of agreements for lease, transfer of flat ownership, completion of resale flat transactions; and financial counselling. Other services will be resumed progressively from June 8, including signing of tenancy documents and issuance of keys for commercial properties.
The closure of construction sites will lead to delays in completion of several upcoming projects. HDB is currently in talks with building contractors and the Building and Construction Authority (BCA) on resuming construction works in phases.
Hutton’s Lee believes that unlike resale properties, circuit breaker measures are unlikely to dampen demand because “BTO flats cater to buyers who can afford to wait and construction activities are gradually resuming from 2 June”.
November 2020 BTO Launch: Sembawang, Tengah, Bishan, Tampines and Toa Payoh
Area
Address
Town/Estate
Flat Mix
Sembawang
Sembawang Avenue
Non-mature
720 units of 2R Flexi, 3R, 4R and 5R
Tengah
Bounded by Tengah Garden Avenue, Tengah Boulevard, Tengah Garden Walk and Plantation Crescent
Non-mature
1,570 units of 2R Flexi, 3R, 4R and 5R
Bishan
Bishan Street 13/14
Mature
1,500 units of 2R Flexi, 3R, 4R
Tampines
Tampines St 96/Bedok Reservoir Road
Mature
750 of units of 2R Flexi, 4R, 5R
Toa Payoh (Bidadari)
Mount Vernon Road
Mature
880 units of 3R, 4R and 5R
Toa Payoh (Bidadari)
Upper Aljunied Road (Next to Alkaff Lake)
Mature
350 units of 3R and 4R
Source: HDB, EdgeProp

Original Article: https://www.edgeprop.sg/property-news/7800-bto-flats-will-be-offered-august-2020

If you are looking to sell or purchase properties in Singapore, our team members can help you with Affordability Assessment and Asset Progression Plan. Call us now at +65 86666 944 or +65 9844 4400

Compare listings

Compare