Prime Minister Lawrence Wong’s National Day Rally speech offered a striking glimpse of how Singapore’s map may change again. Writing in The Straits Times, Ben Chester Cheong, a law lecturer at the Singapore University of Social Sciences, argues that while reclamation captures the headlines, the harder question is whether Singapore can do more with the land it already has, and whether it is leaving enough flexibility for needs it cannot yet foresee.

800ha
Reclaimed at Tekong 2025
150m
Jurong Rock Caverns Depth
1.47M m3
Cavern Storage Capacity
800ha
Freed by Paya Lebar Move

The Bigger Question Behind Reclamation

Several islands off western Singapore could eventually be joined to form a new western island. More land could be reclaimed around Pulau Tekong. And because bridges to Tekong would cut across busy shipping channels, the Government is studying an altogether more ambitious possibility: going underneath them, through undersea road tunnels.

The immediate response is to marvel at the engineering. But there is a bigger story here, Cheong argues. For much of Singapore’s history, our approach to land was simple: we had too little territory, so we reclaimed more of it. But there are limits.

The sea around us is already intensively used for ports and other infrastructure. We cannot extend our coastline indefinitely. Traditional reclamation also involves an enormous amount of sand, which we need to import. Regional restrictions on sand exports have previously forced Singapore to diversify its sources, while exploring other methods of land reclamation that use less sand. Environmental constraints are also growing, as reclamation alters coastlines, marine habitats and water conditions, factors which explain future project timelines. Climate change and rising sea levels add a final complication.

Underground and Below the Sea

In an increasingly crowded city, we should default to a simple rule: functions that do not need the surface should have to make a stronger case for occupying it. We can do more with our underground space.

Jurong Rock Caverns, for example, lies about 150m beneath Jurong Island. Its caverns can store 1.47 million cubic metres of liquid hydrocarbons. Putting that infrastructure underground saves about 60ha of surface land for higher-value activities. Storage tanks, utilities, pipes and transport links do not need sunlight. People generally do.

No doubt going underground is expensive and technically difficult. Underground space is also finite. A tunnel built in the wrong place today could obstruct infrastructure needed decades later. Careful planning is therefore needed. But there is potential to do more.

We can also look below the sea. This is where we need more sophisticated and creative engineering solutions to our land scarcity issue. In 2025, Singapore reclaimed a plot of land of about 800ha off Pulau Tekong, roughly the size of two Toa Payoh towns. It was the first time Singapore reclaimed land below the average sea level, and also shows how radically the idea of land reclamation has changed. Rather than traditional reclamation, a new method called empoldering was used, which reduced sand use by close to half.

Giving Old Land New Lives

There is another source of new land that requires no reclamation at all: old land, Cheong writes. Cities accumulate uses in places that once made sense. Ports needed waterfronts. Airports were built near where the edges of cities. Industrial areas were kept apart from homes. Roads reflected the transport assumptions of their time.

Then the city grows around them, and yesterday’s sensible land use becomes tomorrow’s constraint. As Singapore’s needs grow, we face an increasingly important question: Does everything already on our map still need to be where it is?

Paya Lebar Air Base will be relocated from the 2030s, freeing up about 800ha for a new town. But the real land gain is larger. Removing the airbase will also lift some building height restrictions around it, allowing surrounding areas to be reconsidered.

Singapore does not become one square metre larger. Yet, its effective supply of usable land increases.

AsianPrime Perspective: The Paya Lebar point is the one with the most immediate relevance for property owners. The height restrictions around the airbase have constrained development across a wide swathe of eastern Singapore for decades. Lifting them affects far more land than the 800ha of the base itself. Owners in the surrounding estates should watch how URA treats those areas in future master plan reviews.

Making One Piece of Land Do Several Jobs

We can push this further. Can the next use of our land do several jobs at once? In a land-abundant country, an industrial estate, power facility and defence installation might occupy three separate areas. Singapore cannot afford that luxury.

Where safety and operational requirements permit, the objective should be to co-locate compatible uses so that one piece of land performs several functions. The proposed western island offers a glimpse of this approach. PM Wong said it could accommodate a new generation of industries, including advanced manufacturing, while also providing space for future power-generation infrastructure and defence needs.

The Urban Redevelopment Authority already points to co-location as an explicit land strategy, from stacking facilities to combining uses at sea. Even climate infrastructure is increasingly expected to do more than one job. Marina Barrage, for example, contributes to water supply and flood control while also providing recreational space. A hectare does not need one permanent identity. Nor, increasingly, should it necessarily have only one purpose at a time.

Retaining Flexibility for the Unknown

The scarcer land becomes, the greater the pressure to plan every square metre carefully. But perhaps the wisest use of the land is to not use it yet, Cheong suggests.

Imagine planners in 1976 trying to specify Singapore’s precise land requirements in 2026. They could not have foreseen data centres, today’s digital economy or the exact infrastructure demands created by climate change.

Of course, some decisions cannot wait. Coastal protection or major transport infrastructure that takes decades to deliver falls into that category. But where future needs are genuinely uncertain, committing land too early can also close options.

Singapore’s long-term planning looks 50 years ahead and beyond. URA deliberately identifies future development areas, reserve sites and white sites partly to retain room to adjust plans when needs and opportunities change. We cannot know how the people living in the Singapore of 2076 will work, travel and want to live. We need to ensure they still have room to decide.

AsianPrime Perspective: Cheong’s closing point echoes what PM Wong said about the 500ha set aside on Pulau Tekong with no designated use. Reading the two together, the message for property owners is that Singapore’s land supply strategy is deliberately keeping options open rather than fixing uses decades in advance. Previous decisions changed our coastline so that we can inhabit the Singapore we have today. The challenge is more complicated now: the easier reclamation has been done, the city is denser, environmental constraints are greater, and the demands placed on every hectare have multiplied.

Frequently Asked Questions

Why can Singapore not simply keep reclaiming land?

The sea around Singapore is already intensively used for ports and other infrastructure, so the coastline cannot be extended indefinitely. Traditional reclamation also requires enormous amounts of imported sand, and regional export restrictions have forced Singapore to diversify sources and explore methods using less sand. Environmental constraints, altered marine habitats and rising sea levels add further complications.

What is empoldering and how does it differ from reclamation?

Empoldering is a method used for the 800ha reclaimed off Pulau Tekong in 2025. It was the first time Singapore reclaimed land below the average sea level, and the method reduced sand use by close to half compared with traditional reclamation.

How much land will the Paya Lebar Air Base move free up?

The relocation from the 2030s will free up about 800ha for a new town. The effective land gain is larger, because removing the airbase will also lift some building height restrictions around it, allowing surrounding areas to be reconsidered.

What is co-location and why does it matter?

Co-location means designing land so one parcel performs several functions where safety and operational requirements permit. The Urban Redevelopment Authority points to it as an explicit land strategy, from stacking facilities to combining uses at sea. Marina Barrage is an example, contributing to water supply and flood control while also providing recreational space.

Sherry Tang, AsianPrime Properties

Own property near Paya Lebar?

Lifting the airbase height restrictions from the 2030s affects far more land than the base itself. If you own in the eastern estates, I can tell you how the area is trading and what to watch in the next master plan.