RTS Link Woodlands North Station Completed, Cross-Border Rail on Track for 2027 Opening
The Land Transport Authority announced on 4 September that the RTS Link Woodlands North station is complete, almost six years after construction officially started in 2021. The 4km cross-border line to Bukit Chagar in Johor Bahru remains on track to begin operations in 2027.
Line Length
Expected Daily Ridership
Peak Passengers Per Hour Each Way
Transfer To The MRT
What Was Announced
The milestone was announced by the Land Transport Authority in a Facebook post on 4 September, keeping the Johor Bahru to Singapore RTS Link on track to begin operations in 2027.
The 4km RTS Link is a bilateral project connecting Singapore and Malaysia. It will allow passengers to travel between Bukit Chagar station in Johor Bahru and Woodlands North station in Singapore, which is linked to the MRT in about five minutes.
The shuttle service is expected to have a daily ridership of 40,000. During peak periods, the RTS Link can carry up to 10,000 passengers an hour in each direction, said LTA.
Inside the Station
According to LTA’s website, the Woodlands North station is constructed underground at a maximum depth of 28m. There are three storeys, with two basement levels and an underground linkway to the Customs, Immigration and Quarantine building.
Passengers on the Thomson-East Coast Line can transfer to the RTS Link at the TEL Woodlands North station at Basement 1. The arrival hall is also at Basement 1, as is the ticketing concourse, which features artwork with icons symbolising nature, science, friendship and heritage.
Security checks will be carried out at the immigration halls before travellers head to the train platforms for departure, LTA said. The viaduct on which the cross-border train runs has a feature depicting clasping hands, symbolising the partnership between Singapore and Malaysia.
The colours and design of the pick-up and drop-off point were inspired by trees, incorporating what LTA called the Woodlands identity of nature.
Building It Was Not Straightforward
LTA said the station’s foundation was challenging to build owing to the high volume of hard rock at the site.
To minimise the vibrations felt by passengers on the Thomson-East Coast Line, LTA used high-capacity drilling machines and carried out more than 600 instances of rock blasting. These blasts were carried out in small, controlled quantities whenever trains left the station.
What Happens Next
In August, Malaysian Transport Minister Anthony Loke said all the station and rail infrastructure on the Malaysian side of the RTS Link had been completed. He said then that the RTS Link was in its final integration testing stages between Singapore and Malaysia.
When asked, Loke said details of the fare and launch date would be jointly announced by both countries’ transport ministries. Neither has been confirmed as at the time of the LTA announcement.
Frequently Asked Questions
When will the RTS Link open?
It remains on track to begin operations in 2027. LTA announced on 4 September that the Woodlands North station is complete, and Malaysian Transport Minister Anthony Loke said in August that infrastructure on the Malaysian side was finished and the link was in final integration testing. The exact launch date has not been announced.
How much will it cost to ride?
Fares have not been announced. Loke said details of the fare and launch date would be jointly announced by the transport ministries of both countries.
How do I get to the RTS Link from the MRT?
Passengers on the Thomson-East Coast Line transfer at the TEL Woodlands North station at Basement 1. The station is linked to the MRT in about five minutes.
How many people is it expected to carry?
The shuttle service is expected to have a daily ridership of 40,000. During peak periods it can carry up to 10,000 passengers an hour in each direction.
Looking at property in the north?
Connectivity stories move sentiment quickly. If you are weighing a purchase in Woodlands or the northern corridor, I can help you separate what is committed from what is still an expectation.